Mazak control
Mazak Part Program, Offset Method, Control Key, cycle, Canned Cycle, Drilling Cycle, Macro - Cncprograming.blogspot.com.
Okuma control
Okuma Part Program, Offset Method, Control Key, cycle, Canned Cycle, Drilling Cycle, Macro - Cncprograming.blogspot.com.
Cincinnati control
Cincinnati Part Program, Offset Method, Control Key, cycle, Canned Cycle, Drilling Cycle, Macro - Cncprograming.blogspot.com.
Hass Turning Program
Fanuc Turning Part Program, Offset Method, Control Key, cycle, Canned Cycle, Drilling Cycle, Macro - Cncprograming.blogspot.com.
Showing posts with label Drilling Cycle. Show all posts
Showing posts with label Drilling Cycle. Show all posts
Drilling cycle G83 or G87
3:49 AM
Sivakumar
Drilling cycle (G83 or G87):-
If depth of cut is not specified for each drilling, the normal drilling cycle is used. The tool is then retracted from the bottom of the hole in rapid traverse.
Format:-
G83 X(U)_ C(H)_ Z(W)_ R_ P_ F_ K_ M_ ;
or
G87 Z(W)_ C(H)_ X(U)_ R_ P_ F_ K_ M_ ;
X_ C_ or Z_ C_ : Hole position data
Z_ or X_ : The distance from point R to the bottom of the hole
R_ : The distance from the initial level to point R level
P_ : Dwell time at the bottom of a hole
F_ : Cutting feedrate
K_ : Number of repeats (When it is needed.)
M_ : M code for C–axis clamp (When it is needed.)Examples
Example:-
M51 ; Setting C–axis index mode ON
M3 S2000 ; Rotating the drill
G00 X50.0 C0.0 ; Positioning the drill along the X– and C–axes
C90.0 M31 ; Drilling hole 2
C180.0 M31 ; Drilling hole 3
C270.0 M31 ; Drilling hole 4
G80 M05 ; Canceling the drilling cycle and stopping drill rotation
M50 ; Setting C–axis index mode off
Canned Cycle For Drilling G80-G89
2:19 AM
Sivakumar
Canned Cycle For Drilling (G80 – G89):-
The canned cycle for drilling simplifies the program normally by directing the machining operation commanded with a few blocks, using one block including G code.
Canned cycle:-
G80 = Cancel
G83 = Front Drilling Cycle
G84 = Front Tapping Cycle
G85 = Front Boring Cycle
G87 = Side Drilling Cycle
G88 = Side Tapping Cycle
G89 = Side Boring Cycle
In general, the drilling cycle consists of the following six operation sequences.
Operation 1 = Positioning of X (Z) and C axis
Operation 2 = Rapid traverse up to point R level
Operation 3 = Hole machining
Operation 4 = Operation at the bottom of a hole
Operation 5 = Retraction to point R level
Operation 6 = Rapid traverse up to the initial point
Notes:-
i. For the B or C G–code system, G90 or G91 can be used to select an incremental or absolute command for hole position data (X, C or Z, C), the distance from point R to the bottom of the hole (Z or X), and the distance from the initial level to the point R level (R).
ii. In each canned cycle,R_ (distance between the initial level and point R) is always handled as a radius.Z_ or X_ (distance between point R and the bottom of the hole) is, however, handled either as a diameter or radius, depending on the specification.